Combined-cycle power plant — owner's engineering

Overview

Owner’s engineering for a gas-fired combined-cycle facility: independent review of the EPC contractor’s design, evaluation of major equipment vendors, and continuous site assurance from first concrete to commercial operation.

Challenges

  • — Compressed schedule with parallel design and procurement.
  • — Multi-vendor interfaces across turbine, HRSG and BOP packages.
  • — Grid-code compliance under evolving national requirements.

Solutions

  • — Staged design-review gates tied to procurement milestones.
  • — Single interface register owned by the OE team.
  • — Early engagement with the grid operator on compliance studies.

Outcomes

0

Design-related NCRs at handover

100%

Vendor packages reviewed pre-award

COD

Achieved within contract window